Product

The forklift transports the stacked piles to the climbing platform. The platform rolls over at a certain angle, starts to rise, rises to the corner position, and starts to tilt. After the stack material reaches the collapse angle, it starts to incline and unload the material into the cutting hopper of the bag unpacker to start the subsequent process of bag unpacking. The stacking bag rises to the highest point, and after all the bag materials are put in, it moves back to the initial position according to the original ascending trajectory and starts the next cycle process.
After the knife breaks the bag, it enters the screening and dust removal, and finally the waste bag falls from the outlet of the waste bag.

Additional information

Power

380v/50hz/3ph

Height

Adjustable

Usage

25-50kgs bag unloading

Feature

Easy operation,long service life

Certification

CE,ISO

OEM

Accept

Climbing bucket bag unloading machine

SPECIFICATIONS
Motor
Motor Power
Kw
3
Power
Voltage
380/220
Capacity
bag/hour
<=800
 

Main performance parameters

Bag weight
kg/bag
25-50
Dust collecting rate
%
>99%
Lifting capacity
ton
<=3t

Specifications:

1) The overall structure is welded;
2) The construction is firm, compact and beautiful in design;
3) According to the actual needs of users choose a variety of main material:stainless steel(SS304,SS304L,SS316,316L) etc.
4) Can be associated with dust separation and filtration equipment or with the central vacuum cleaner assembly;
5) The hoppers for collecting material are available in different volumes;
6) The support legs can be height-adjusted;
7) Recyclable waste bags can be configured to handle the compressor;
8) Can be equipped with automatic bag breaking mechanism;

ArabicChinese (Simplified)DutchEnglishFrenchGermanItalianPortugueseRussianSpanish

Ask For A Quick Quote

We want to hear from you

The Ultimate Guide To Sourcing Transportation Machinery In China